Cincinnati Traffic Cameras & Live Conditions

As of 9:25 AM EST, 0 of 6 major Cincinnati highways have a major incident or full closure, 1 is slow or has lanes closed, and 5 are clear. 122 traffic cameras are live across Cincinnati. Updated

Live traffic cameras, crashes, closures and road work on Cincinnati highways in Ohio: I-71 through the Lytle Tunnel north to Kenwood and Mason, I-75 from downtown past the Lockland Split to Liberty Township, the I-275 beltway on the north and east sides and I-74 west to I-275.

Put thison yourTV

Cincinnati crossings, cameras and weather on one full-screen board that changes by itself. Free, and nothing to install.

Incidents now

  • I-71 northbound: The right lane is blocked on I-71 North beyond SR-561/Smith Rd/Edwards Rd, due to a crash.

    I-71 · moderate · reported 4 min ago

Road work (19) · listed, highways stay green
  • I-71 northbound: Long-term: As part of the Brent Spence Bridge Corridor Project, the ramp from I-71 North to Second Street will be closed for demolition and reconstruction. The closure will go into effect July 16, 2026, and will remain in effect through late fall of 2028. Motorists will be detoured by way of I-75 North to the Fifth Street exit (Exit 1C) and Race Street to Second Street.

    I-71 · Work zone (highway stays green) · since Jul 16

  • I-71 northbound: Long-term: Replacement of the pedestrian bridge over I-71 and I-471, between VanMeter Street and Gilbert Avenue, and replacement of the pedestrian bridge over Gilbert Avenue (U.S. 22). The project also includes construction of a new shared use path bridge over I-71, I-471 and U.S. 22, and construction of a new stairway. Traffic on I-71 and I-471 will be maintained; however, Gilbert Avenue will be subject to restrictions and intermittent periods of closure.

    I-71 · Work zone (highway stays green) · since Apr 14, 2025

  • I-75 southbound: Long-term: On or after Tuesday, June 30, the ramp from I-75 South to Second Street (Exit 1A) will be closed at 11 p.m. to start demolition. Traffic will be detoured by way of W. 5th Street (Exit 1C) and Race Street to Second Street. This is a permanent closure, and the ramp will be replaced with a new ramp to 3rd Street, with access to 2nd Street.

    I-75 · Work zone (highway stays green) · since Jun 30

  • I-75 southbound: Long-term: On or after Tuesday, June 30, the ramp from I-75 South to Second Street (Exit 1A) will be closed at 11 p.m. to start demolition. Traffic will be detoured by way of W. 5th Street (Exit 1C) and Race Street to Second Street. This is a permanent closure, and the ramp will be replaced with a new ramp to 3rd Street, with access to 2nd Street.

    I-75 · Work zone (highway stays green) · since Jun 30

  • I-75 southbound: Long-term: On or after Tuesday, June 30, the ramp from I-75 South to Second Street (Exit 1A) will be closed at 11 p.m. to start demolition. Traffic will be detoured by way of W. 5th Street (Exit 1C) and Race Street to Second Street. This is a permanent closure, and the ramp will be replaced with a new ramp to 3rd Street, with access to 2nd Street.

    I-75 · Work zone (highway stays green) · since Jun 30

  • I-75 southbound: Long-term: The ramp from Western Avenue to I-75 South is closed as part of the Linn Street Bridge reconstruction project. This is a permanent closure. The ramp is closed, and motorists may follow Freeman Avenue and the 6th Street/U.S. 50/River Road.

    I-75 · Work zone (highway stays green) · since Apr 17

  • I-75 westbound: Long-term: Replacement of three railroad bridges located over Prosser Avenue, I-75, and SR 562 and minor realignment of I-75 lanes to accommodate railroad bridge piers. Various lane closures will be in effect on I-75, as well as on S.R. 562, as work progresses on the structures over these routes.

    I-75 · Work zone (highway stays green) · since Sep 9, 2024

  • I-75 westbound: Long-term: Replacement of three railroad bridges located over Prosser Avenue, I-75, and SR 562 and minor realignment of I-75 lanes to accommodate railroad bridge piers. Various lane closures will be in effect on I-75, as well as on S.R. 562, as work progresses on the structures over these routes.

    I-75 · Work zone (highway stays green) · since Sep 9, 2024

  • I-75 northbound: Long-term: Replacement of three railroad bridges located over Prosser Avenue, I-75, and SR 562 and minor realignment of I-75 lanes to accommodate railroad bridge piers. Various lane closures will be in effect on I-75, as well as on S.R. 562, as work progresses on the structures over these routes.

    I-75 · Work zone (highway stays green) · since Sep 9, 2024

  • I-75 northbound: Long-term: Replacement of three railroad bridges located over Prosser Avenue, I-75, and SR 562 and minor realignment of I-75 lanes to accommodate railroad bridge piers. Various lane closures will be in effect on I-75, as well as on S.R. 562, as work progresses on the structures over these routes.

    I-75 · Work zone (highway stays green) · since Sep 9, 2024

  • I-75 northbound: Long-term: Widening of I-75 N/S between S.R. 126/RRCC and Towne Street. Traffic will be maintained with intermittent lane restrictions during evening and overnight hours. Ramp closures may also be in effect at various times. The pedestrian bridge over I-75, between Section Road and City Centre Drive will be closed throughout the project, and Summit Road will be closed effective October 20, 2025 for up to 30 months.

    I-75 · Work zone (highway stays green) · since Jun 1, 2025

  • I-75 southbound: Long-term: Widening of I-75 N/S between S.R. 126/RRCC and Towne Street. Traffic will be maintained with intermittent lane restrictions during evening and overnight hours. Ramp closures may also be in effect at various times. The pedestrian bridge over I-75, between Section Road and City Centre Drive will be closed throughout the project, and Summit Road will be closed effective October 20, 2025 for up to 30 months.

    I-75 · Work zone (highway stays green) · since Jun 1, 2025

  • I-75 northbound: Long-term: Phase 8B of the Mill Creek Expressway Project. Project will construct a new Pump Station and Combined Sewer Overflow for the widening of IR 75. Phases 8+8C widen for additional through lanes, rehabilitate existing pavement and bridges. Reconstruct SR 56 2 interchange, remove the Towne Ave. interchange, complete minor improvements to the Paddock Road interchange, and tie into the existing SR 126 interchange southern ramps. Project extends from SR 562 to SR 126/Galbrai…

    I-75 · Work zone (highway stays green) · since Jun 5, 2024

  • I-75 eastbound: Long-term: The pedestrian bridge over I-75, between Section Road and City Centre Drive, is closed for reconstruction. Users will be detoured via Summit and Paddock roads.

    I-75 · Work zone (highway stays green) · since Sep 3, 2025

  • I-75 northbound: Long-term: Rehabilitation of the bridge on northbound I-75 over Mill Creek, Benson Street and Shepherd Lane, as well as resurfacing I-75 North South through the Lockland Split. Currently, work is being conducted off the roadway, and there are no impacts to traffic. During construction, traffic will be maintained in a minimum of one lane in either direction.

    I-75 · Work zone (highway stays green) · since Jan 12

  • I-275 northbound: Long-term: A bridge rehabilitation project on Branch Hill Miamiville Road over I-275. Traffic on I-275 will be maintained with shoulder closures and periodic lane closures. Branch Hill Miamiville Road is closed through mid-September 2026.

    I-275 E · Work zone (highway stays green) · since Mar 9

  • I-275 westbound: Long-term: A 16-foot height restriction will be in effect on the Branch Hill Miamiville Road bridges over I-275. Traffic on I-275 will be maintained through the work zone.

    I-275 E · Work zone (highway stays green) · since Sep 30

  • I-275 southbound: Long-term: A bridge rehabilitation project on Branch Hill Miamiville Road over I-275. Traffic on I-275 will be maintained with shoulder closures and periodic lane closures. Branch Hill Miamiville Road is closed through mid-September 2026.

    I-275 E · Work zone (highway stays green) · since Mar 9

  • I-275 eastbound: Long-term: A 16-foot height restriction will be in effect on the Branch Hill Miamiville Road bridges over I-275. Traffic on I-275 will be maintained through the work zone.

    I-275 E · Work zone (highway stays green) · since Sep 30

Traffic alerts by email

A closure or serious crash on your highway or commute. Free for one.

Highways

Questions about Cincinnati traffic

What is traffic like in Cincinnati right now?

As of 9:25 AM EST, 0 of 6 major Cincinnati highways have a major incident or full closure, 1 is slow or has lanes closed, and 5 are clear. 122 traffic cameras are live across Cincinnati.

Which Cincinnati highways have traffic cameras?

I-71 Downtown to I-275 (32 cameras), I-71 I-275 to Mason (12 cameras), I-75 Downtown to Liberty Township (36 cameras), I-275 Colerain to Sharonville (10 cameras), I-275 I-71 to Kellogg Ave (22 cameras) and I-74 I-75 to I-275 (10 cameras).

Where can I watch live Cincinnati traffic cameras?

On this page and each highway page. Cameras show still images from OHGO, refreshed every minute; cameras with real-time video are marked LIVE.

Are there accidents or closures on Cincinnati highways now?

1 active incident as of 9:25 AM EST. The most serious: I-71 northbound: The right lane is blocked on I-71 North beyond SR-561/Smith Rd/Edwards Rd, due… (I-71, moderate). 19 work zones are listed.

What do the green, amber and red highway colors mean?

Green means no incidents, only minor ones, or only work zones. Amber means a crash or other incident slowing traffic, or work closing a travel lane right now (planned roadwork outside its scheduled hours does not count). A ramp or shoulder closure, minor work, and months-long project notices are listed as work zones but leave the highway green. Red means a severe or critical incident, such as a crash blocking lanes, or a road closed in one direction (labeled Closed). Colors update every two minutes from transportation department incident feeds. Grey means no status: the data did not load, or the incident feed has not reported for over an hour, so no highway is shown green without data.

About these cameras

Camera images come from OHGO. Still images refresh every minute. Incidents and closures come from OHGO and refresh every few minutes.

  • Camera images, incidents and road work from the Ohio Department of Transportation (ODOT), published through OHGO. OHGO

Planning a longer drive? Check weather and traffic along your whole route.

joonoo.art: a storybook starring your child. See your cover free.

Sponsor