I-75 Downtown to Liberty Township Traffic Cameras

Clear

As of 9:27 AM EST, I-75 is clear with no active incidents (13 work zones listed). 36 traffic cameras cover the road from Downtown (3rd St) to Liberty Way. Updated

I-75 from 3rd St downtown north past the Western Hills Viaduct and Hopple St, I-74, Mitchell Ave and the Norwood Lateral, the Ronald Reagan Highway and the Lockland Split, I-275 and Union Centre Blvd to Liberty Way.

Incidents on the I-75

No active incidents on the I-75 right now.

Road work (13) ยท listed, highways stay green
  • I-75 southbound: Long-term: On or after Tuesday, June 30, the ramp from I-75 South to Second Street (Exit 1A) will be closed at 11 p.m. to start demolition. Traffic will be detoured by way of W. 5th Street (Exit 1C) and Race Street to Second Street. This is a permanent closure, and the ramp will be replaced with a new ramp to 3rd Street, with access to 2nd Street.

    Work zone (highway stays green) ยท since Jun 30

  • I-75 southbound: Long-term: On or after Tuesday, June 30, the ramp from I-75 South to Second Street (Exit 1A) will be closed at 11 p.m. to start demolition. Traffic will be detoured by way of W. 5th Street (Exit 1C) and Race Street to Second Street. This is a permanent closure, and the ramp will be replaced with a new ramp to 3rd Street, with access to 2nd Street.

    Work zone (highway stays green) ยท since Jun 30

  • I-75 southbound: Long-term: On or after Tuesday, June 30, the ramp from I-75 South to Second Street (Exit 1A) will be closed at 11 p.m. to start demolition. Traffic will be detoured by way of W. 5th Street (Exit 1C) and Race Street to Second Street. This is a permanent closure, and the ramp will be replaced with a new ramp to 3rd Street, with access to 2nd Street.

    Work zone (highway stays green) ยท since Jun 30

  • I-75 southbound: Long-term: The ramp from Western Avenue to I-75 South is closed as part of the Linn Street Bridge reconstruction project. This is a permanent closure. The ramp is closed, and motorists may follow Freeman Avenue and the 6th Street/U.S. 50/River Road.

    Work zone (highway stays green) ยท since Apr 17

  • I-75 westbound: Long-term: Replacement of three railroad bridges located over Prosser Avenue, I-75, and SR 562 and minor realignment of I-75 lanes to accommodate railroad bridge piers. Various lane closures will be in effect on I-75, as well as on S.R. 562, as work progresses on the structures over these routes.

    Work zone (highway stays green) ยท since Sep 9, 2024

  • I-75 westbound: Long-term: Replacement of three railroad bridges located over Prosser Avenue, I-75, and SR 562 and minor realignment of I-75 lanes to accommodate railroad bridge piers. Various lane closures will be in effect on I-75, as well as on S.R. 562, as work progresses on the structures over these routes.

    Work zone (highway stays green) ยท since Sep 9, 2024

  • I-75 northbound: Long-term: Replacement of three railroad bridges located over Prosser Avenue, I-75, and SR 562 and minor realignment of I-75 lanes to accommodate railroad bridge piers. Various lane closures will be in effect on I-75, as well as on S.R. 562, as work progresses on the structures over these routes.

    Work zone (highway stays green) ยท since Sep 9, 2024

  • I-75 northbound: Long-term: Replacement of three railroad bridges located over Prosser Avenue, I-75, and SR 562 and minor realignment of I-75 lanes to accommodate railroad bridge piers. Various lane closures will be in effect on I-75, as well as on S.R. 562, as work progresses on the structures over these routes.

    Work zone (highway stays green) ยท since Sep 9, 2024

  • I-75 northbound: Long-term: Widening of I-75 N/S between S.R. 126/RRCC and Towne Street. Traffic will be maintained with intermittent lane restrictions during evening and overnight hours. Ramp closures may also be in effect at various times. The pedestrian bridge over I-75, between Section Road and City Centre Drive will be closed throughout the project, and Summit Road will be closed effective October 20, 2025 for up to 30 months.

    Work zone (highway stays green) ยท since Jun 1, 2025

  • I-75 southbound: Long-term: Widening of I-75 N/S between S.R. 126/RRCC and Towne Street. Traffic will be maintained with intermittent lane restrictions during evening and overnight hours. Ramp closures may also be in effect at various times. The pedestrian bridge over I-75, between Section Road and City Centre Drive will be closed throughout the project, and Summit Road will be closed effective October 20, 2025 for up to 30 months.

    Work zone (highway stays green) ยท since Jun 1, 2025

  • I-75 northbound: Long-term: Phase 8B of the Mill Creek Expressway Project. Project will construct a new Pump Station and Combined Sewer Overflow for the widening of IR 75. Phases 8+8C widen for additional through lanes, rehabilitate existing pavement and bridges. Reconstruct SR 56 2 interchange, remove the Towne Ave. interchange, complete minor improvements to the Paddock Road interchange, and tie into the existing SR 126 interchange southern ramps. Project extends from SR 562 to SR 126/Galbraiโ€ฆ

    Work zone (highway stays green) ยท since Jun 5, 2024

  • I-75 eastbound: Long-term: The pedestrian bridge over I-75, between Section Road and City Centre Drive, is closed for reconstruction. Users will be detoured via Summit and Paddock roads.

    Work zone (highway stays green) ยท since Sep 3, 2025

  • I-75 northbound: Long-term: Rehabilitation of the bridge on northbound I-75 over Mill Creek, Benson Street and Shepherd Lane, as well as resurfacing I-75 North South through the Lockland Split. Currently, work is being conducted off the roadway, and there are no impacts to traffic. During construction, traffic will be maintained in a minimum of one lane in either direction.

    Work zone (highway stays green) ยท since Jan 12

Traffic alerts by email

A closure or serious crash on your highway or commute. Free for one.

Drive the I-75

Every camera in order, Downtown (3rd St) โ†’ Liberty Way. Tap a camera for a larger view.

Questions about I-75 traffic

Is there traffic on I-75 right now?

As of 9:27 AM EST, I-75 is clear with no active incidents (13 work zones listed). 36 traffic cameras cover the road from Downtown (3rd St) to Liberty Way.

Where are the traffic cameras on I-75?

Route Outlook shows 36 traffic cameras on I-75 Downtown to Liberty Township between Downtown (3rd St) and Liberty Way, in driving order. They include I-75 at 6th St, I-75 at N of Towne St and I-75 at Liberty Way, SR-129.

Can I watch live video of I-75?

The I-75 cameras show still images from OHGO, refreshed every minute. Where the provider streams real-time video, cameras are marked LIVE.

How often are I-75 traffic camera images updated?

Route Outlook refreshes each camera image once a minute. The camera's provider uploads new photos on its own schedule, and the label on each enlarged image shows how long ago it was updated.

What do the green, amber and red highway colors mean?

Green means no incidents, only minor ones, or only work zones. Amber means a crash or other incident slowing traffic, or work closing a travel lane right now (planned roadwork outside its scheduled hours does not count). A ramp or shoulder closure, minor work, and months-long project notices are listed as work zones but leave the highway green. Red means a severe or critical incident, such as a crash blocking lanes, or a road closed in one direction (labeled Closed). Colors update every two minutes from transportation department incident feeds. Grey means no status: the data did not load, or the incident feed has not reported for over an hour, so no highway is shown green without data.

  • Camera images, incidents and road work from the Ohio Department of Transportation (ODOT), published through OHGO. OHGO
joonoo.art: a storybook starring your child. See your cover free.

Sponsor